Close Menu
  • Home
  • News
  • Politics
  • Education
  • Opinion
  • Entertainment
  • Tech
  • Crime
  • Health
  • Sports
What's Hot

Peter Obi’s presence at Makinde’s campaign office launch a political phenomenon – APM

September 8, 2026

FG moves academic certificate verification online

September 8, 2026

Adedayo Showemimo: Road to 2027 – Tinubu and his army of experienced spokesmen

September 8, 2026
Facebook X (Twitter) Instagram
Trending
  • Peter Obi’s presence at Makinde’s campaign office launch a political phenomenon – APM
  • FG moves academic certificate verification online
  • Adedayo Showemimo: Road to 2027 – Tinubu and his army of experienced spokesmen
  • I’m half-Nigerian, not Jamaican — British singer Kwn
  • Oyo 2027: Civil servants wait for seven to 10 years before receiving entitlements – ADC guber candidate
  • Zamfara Gov appoints Aminu Atiku as new Emir of Zurmi
  • BBNaija S11: Tram wins Head of House for week 7
  • Dollar to Naira exchange rate today, September 7, 2026: Naira appreciates to begin week on good note
Facebook X (Twitter) Instagram LinkedIn Telegram
Sahara Reports
  • Home
  • News
  • Politics
  • Education
  • Opinion
  • Entertainment
  • Tech
  • Crime
  • Health
  • Sports
Sahara Reports
Home » TCN announces over two-week blackout in Abuja
abuja

TCN announces over two-week blackout in Abuja

adminBy adminOctober 28, 2025No Comments2 Mins Read
WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
Share
WhatsApp Facebook Twitter LinkedIn Pinterest Email Copy Link

The Transmission Company of Nigeria, TCN, has announced that there will be electricity disruption lasting over two weeks in parts of Abuja.

TCN’s spokesperson, Ndidi Mbah, disclosed this in a statement on Monday.

According to the company, the outage, scheduled from Tuesday, October 27, to Sunday, November 16, is due to road construction activities in the Federal Capital Territory.

It explained that the 132-kilovolt Gwagwalada–Kukwaba–Apo double-circuit transmission line would be without power supply during the period. Consequently, bulk electricity supply will be temporarily unavailable in the Apo, Lokogoma, Guzape, Asokoro, Wuye, Utako, Jabi, and Idu Industrial Layout areas within the construction period.

ALSO READ  EPL: Chelsea hit with £10.75m fine, transfer ban

“The Transmission Company of Nigeria, TCN, wishes to inform the public that there will be power outages in some parts of the Federal Capital Territory , as the Federal Capital Development Authority will commence road construction works along the Kuje axis from Tuesday, 28th October, to 16th November, 2025. The construction work will affect the 132 kV Gwagwalada-Kukwaba-Apo double-circuit transmission line.

“In view of this, TCN will undertake a planned load management operation that will involve temporary interruption of power within the working hours for the road construction to ensure the safety of all stakeholders.

“The planned outage will be executed in three phases to enhance seamless operations. The first phase is scheduled to commence from Tuesday, 28th October, to Sunday, 2nd November, 2025, between the hours of 9:00 a.m. and 5:00 pm daily. The second phase will take place from 6th November to 9th November 2025 between 9.00 am and 5.00 pm daily, while the third phase will take effect from 12th November to 16th November 2025 between 9.00 am and 3.00 pm daily.

ALSO READ  UCL: We will deliver - Arteta speaks on final between Arsenal, PSG

“However, TCN assures that during this period, the following areas within the FCT, namely Apo, Lokogoma, Guzape, Asokoro, Wuye, Utako, Jabi, and Idu Industrial Layout, will experience temporary power interruption, while normal power supply will be restored to the affected areas at the end of each day’s work period,” TCN stated.

Featured
Share. WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
admin
  • Website

Related Posts

Peter Obi’s presence at Makinde’s campaign office launch a political phenomenon – APM

September 8, 2026

FG moves academic certificate verification online

September 8, 2026

Adedayo Showemimo: Road to 2027 – Tinubu and his army of experienced spokesmen

September 8, 2026

Leave A Reply Cancel Reply

Editors Picks
Latest Posts

Stay connected for the latest News updates across Nigeria

Services
  • Home
  • News
  • Politics
  • Education
  • Opinion
  • Entertainment
  • Tech
  • Crime
  • Health
  • Sports
  • Home
  • About Us
  • Contact Us
  • Privacy Policy
© 2026 Sahara Reports. Designed by Domo TECH Media.

Type above and press Enter to search. Press Esc to cancel.