Close Menu
  • Home
  • News
  • Politics
  • Education
  • Opinion
  • Entertainment
  • Tech
  • Crime
  • Health
  • Sports
What's Hot

Troops engage six suspected bandits in Kogi forests

November 22, 2026

Petrol pump price reduces by N85 per litre in seven days

November 22, 2026

Niger Community Attack: Govt deploys security teams after attack leaves five dead in Borgu

November 22, 2026
Facebook X (Twitter) Instagram
Trending
  • Troops engage six suspected bandits in Kogi forests
  • Petrol pump price reduces by N85 per litre in seven days
  • Niger Community Attack: Govt deploys security teams after attack leaves five dead in Borgu
  • Troops prevent possible abduction in Kaduna college
  • Somalia, Türkiye deepen military ties with new joint naval base
  • LaLiga: Real Madrid move level on points with Barcelona after Celta Vigo win
  • CBN’s next move as naira weakens against dollar, foreign reserves drop to $54.65bn
  • EPL: Why Arsenal failed to defeat Newcastle – Arteta
Facebook X (Twitter) Instagram LinkedIn Telegram
Sahara Reports
  • Home
  • News
  • Politics
  • Education
  • Opinion
  • Entertainment
  • Tech
  • Crime
  • Health
  • Sports
Sahara Reports
Home » Umahi gives condition for reopening of First Niger Bridge
First Niger Bridge

Umahi gives condition for reopening of First Niger Bridge

adminBy adminSeptember 24, 2026No Comments1 Min Read
WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
Share
WhatsApp Facebook Twitter LinkedIn Pinterest Email Copy Link

Minister of Works, Senator David Umahi, has said the First Niger Bridge will not be reopened until the major structural rehabilitation works are completed.

Umahi was speaking on Wednesday at the Onitsha Bridge Head.

He had visited the bridge to inspect ongoing rehabilitation works.

Umahi insisted that the Federal Government will not be pressurized into reopening the bridge until critical structural components identified for rehabilitation had been properly repaired.

Recommended

“We are not going to be stampeded to open the bridge until the major structural work has been achieved,” Umahi said.

The First Niger Bridge was closed to traffic for emergency rehabilitation following the discovery of vandalised structural components, including bolts, nuts and portions of its expansion-joint steelwork.

ALSO READ  Turkey: Osimhen grabs assists in Galatasaray's derby win over Kasimpasa 

The closure, initially scheduled to end on September 21, has been extended by one week due to persistent rainfall affecting the rehabilitation work.

You may like

Featured
Share. WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
admin
  • Website

Related Posts

Troops engage six suspected bandits in Kogi forests

November 22, 2026

Petrol pump price reduces by N85 per litre in seven days

November 22, 2026

Niger Community Attack: Govt deploys security teams after attack leaves five dead in Borgu

November 22, 2026

Leave A Reply Cancel Reply

Editors Picks
Latest Posts

Stay connected for the latest News updates across Nigeria

Services
  • Home
  • News
  • Politics
  • Education
  • Opinion
  • Entertainment
  • Tech
  • Crime
  • Health
  • Sports
  • Home
  • About Us
  • Contact Us
  • Privacy Policy
© 2026 Sahara Reports. Designed by Domo TECH Media.

Type above and press Enter to search. Press Esc to cancel.